An Overview Futurism has well defined procedures
and standards for project estimation in terms of deriving
efforts and cost. The Project Plan is prepared at
the end Project Initiation phase. The project plan
consists of detail break up of the activities along
with the deadlines and owner of each activity.
Standard configuration management tool is used to
maintain all the configurable items like project documentation,
project code and project coding standard documentation.
The Project is monitored very closely to ensure smooth
and timely progress. Periodic code reviews, process
reviews are conducted to provide high quality of deliverables
to ensure client satisfaction. Variation/Change Requirement
in the project is analyzed, discussed with the client
and necessary corrective measures are derived and
reflected in the project plan. Progress of the project
is communicated to the client on a regular basis in
the form of project status report.
Futurism has proven procedures for project management
including standard procedure for requirements analysis,
software design, software coding and testing. For
every project the procedures are blended in accordance
with the client need and requirement. Client Participation
Success of the project can depend not only on timely
delivery of the project but efficiency in delivering
all the changes suggested by the client. In most of
the cases this means over-run of the schedule and
a not so happy customer. Futurism strives to avoid
the situation by increasing the client participation
during every important phase of the project. Effective
mechanisms are used that provide transparency of all
the activities of the project, at any point of time,
irrespective of the client location.
|